Product Details:
Payment & Shipping Terms:
|
Stitches Rate: | 12-32Stitches/10cm | Pile Height: | 60 Mm (40~65 Mm Available) |
---|---|---|---|
Backing: | Woven | Dtex: | 13000 |
Application: | Could Be Recycled Strong Wear - Resisting | ||
High Light: | football synthetic grass,football synthetic turf |
Could Be Recycled Strong Wear - Resisting Football Artificial Turf
artificial grass is a surface of synthetic fibres made to look like natural grass . It is most often used in arenas for sports that were originally or are normally played on grass . However , it is now being used on residential lawns and commercial applications as well . The main reason is maintenance — artificial turf stands up to heavy use , such as in sports , and requires no irrigation or trimming . Domed , covered , and partially covered stadiums may require artificial turf because of the difficulty of getting grass enough sunlight to stay healthy . Artificial turf is easy to install and has low maintenance cost , all weather use .
advantage:
Specifications:
Product | Could Be Recycled Strong Wear - Resisting Football Artificial Turf |
Brand | AVG |
Material | Monofilament PE |
Pile Height | 60mm(40~65mm available) |
Yarn Dtex | 13000 |
Yarn Type | Straight |
Yarn Content | Anti-UV Monofilament PE |
Gauge | 3/4”, 3/8”, 3/16”, 5/8”, 5/32” |
Stitches Rate | 12-32Stitches/10cm |
Tufts Density | 10000-100000/Sqm |
Primary Backing | Anti-aged PP Basic Cloth |
Secondary Backing | Anti-aged PP Non-woven Cloth |
Backing | Woven Backing |
Drainage Design | Drainage Holes |
Color | Green or Customized |
Color Fastness | Warranty period will not fade |
Guarantee | 12 Years |
Roll Width | up to 5m |
Application | Could Be Recycled Strong Wear - Resisting |
How to install the artificial grass
1.1. Inspection:
Inspect the foundation to ensure it has a flat and smooth surface and appropriate slopes,making sure the foundation is qualified for installing artificial turf;
1.2. Measuring:
Locate the centers of the ground and the two semicircles, and according to these three centers locate the intersecting point of half-way lines and touchlines, and then determine the positions of functional lines and spot by using Pythagorean proposition;
2. Turf layout:
According to drawing, position the turf rolls on the exact places along the touchline.The turf with white lines should be placed at the half-way lines and base line, and then lay out the rolls in order;
3. Preparing functional line:
Cut white turf piece into strips(width to be as per actual need) for white functional lines(half-way lines, base lines etc.), and put them aside preparing for Green Artificial Grass Carpet installation;
4. Seaming:
The adiacent turf rolls must be join together with 20~30mm excess on both sides, then cut the excess part with a special cutting knife on the joint center and trim the cut to make the turf join perfectly together. After trimming, place the seam tape on the foundation surface and make the joint line of turf right on the middle of the seam tape. And then apply the adhesive to seam tape evenly with a rubber spreader, and press down the turf on both sides of the seam tape firmly;
5.1. Installing functional lines:
Measure and re-position the functional line on the turf that has been all well joined on the ground. Cut the turf out and place the seam tape beneath the cuts, then spread the adhesive on the seam tape and install the well-prepared functional lines, press it firmly to ensure the immobility.
5.2. Trimming:
Inspect the finished lawn, if any uneven found, cut it open, pull it straight and cut the excess away.And rejoin it with adhesive;
6. Infilling sand:
Place the sand piles on the finished lawn on different spots evenly at a distance of 4m from each other,then spread them evenly on the lawn(the quantity if sand depends on the pile height of the turf).
Afterwards, use the combing machine to sweep the sand into the fibers and to comb uo the fibers. Do this process once longitudinally and transversely.
7. Infill rubber granules:
After sand infilling, Place the rubber granules piles on the lawn on different spots evenly at a distance of 4m from each other, then spread them evenly on the lawn(the quantity of sand depends on the pile height of the turf). Afterwards, use the combing machine to sweep the sand into the fibers and to comb up the fibers. Do this process once longitudinally and transversely.
8. Combing:
Once the infilling is finished, comb the turf once more with the combing machie to make the fibers point up to the sky.
9. Inspection:
Inspect the entire finished lawn as per concerned standards and requirement.If any defects found,correct it.